All five schools have their 2 new liquad propane boilers installed and their new propane tanks installed.
All boilers have been checked and certified by the insurance company boiler inspector.
All schools are currently being heated with the new boilers.
New potable water systems (pumps, tanks, piping and controls) are now complete at Indian Valley Elementary and Willis Elementary replacing the existing systems.
Most of the new water system equipment is set in place. All of our other schools have new systems.